Electric Vehicle Charging for Your Home
What You Need To Know
Electric vehicles are the talk of the town in a technologically driven world. Imagine a world void of air pollution brought by petroleum inclined cars like we have it today? That’s what electric cars are set to achieve! If the regular vehicles are powered by petrol, electric vehicles in their own rights are charged up to be effective.
To charge electric vehicles, each one of them have their own plugs, charging times, potential savings and cost. However, the type of charge you pick depends on your driving needs. More homeowners want to own electric vehicles and install charging ports in their abodes. There are a few things to note about electric cars and installing their charging ports.
Here you go:
Check out your Current Electrical facilities
Installing an electric car charging port in your home means you have to assess if you have the required electrical infrastructure. This should be determined by a commercial electrician. Your car packing area or garage should include the necessary wiring outlets required for a proper installation. However, it is the job of a licensed industrial electrician who is vast in industrial electrical wiring to ascertain if they meet the required standards. It is important to call on an experienced electrician to do a first hand check before the installation is done.
Do you want to plug in on the go or at Home?
It is a great idea to assess what works best for your electric vehicle. Put into consideration the type of vehicle you have purchased for a more specific answer to your needs. If you drive your car to work, you may want to have a charging electric station at work, at malls, parking stations or some other places designed for such purposes.
However, if your vehicle spends the most part at home, installing a charger at home would be a great idea. It is therefore important to know the best solution for your vehicle. More so, the one that suits your needs.
Speed of Charging
Another thing to consider when installing an electric vehicle charger is the speed. A standard outlet in your home would charge your electric car. This method is called level 1 and it’s relatively slower. It makes use of 120 volts, taking a lot of time to charge, compared to customized electric car charging ports.
However, installing a level 2 electric car charging port charges your electric vehicle quickly with 240-volt power. This means you need the standard of a 240-volt power supply, and some wiring upgrades to use the option.
The choice of a Level 2 EVSE Charger
Choosing the level 2 higher powered charging option means you’re ready to opt for the best. The manufacturer of your electric vehicle could recommend the charger that fits the model of your car. Usually, you’d have to get to your vehicle’s manufacturer
Install Your Charger
This is about the most important aspect. Selecting a knowledgeable installer is also key. His duties are to put in place what would make the installation a smooth ride. Involving a professional commercial electrician ensures your new charging station functions properly.
Talking about how long it will take to install an electric vehicle charger, it usually takes 2-3 hours on average. While some other serious installations take longer time. Most electric vehicle chargers would require some fittings in the chargepoint closely attached to a brick or some other suitable materials. Installation of one earth electrode near the charge point
Conclusion
This varies from place to place, and depending on if you want to charge at home, it comes cheaper than what it costs to fuel the new gasoline vehicle. This varies from user to user. However, drivers save almost $1000 annually, by switching from gasoline to electricity. Moreso, the costs to charge at public charging stations also vary. While some stations are free, others cost twice as much as home charging. However, a high percentage of people would like to charge from home because it is cheaper.
For electric vehicles charger installations, about 15 meters of 6mm power cable is used to connect the distribution board or electricity supply meter and the chargepoint, while the fittings and testings of electrical connections and protections for the charge point are done, Moreso, about 5 meters of some white plastic conduit would be required to close up the wires